Skip to Content
  • Follow us
  • +44 (0) 330 127 7928
Zikodrive
  • 0
  • Sign in
  • Contact Us
  • Services

    Services


    Custom Motor Controller Design Contract Electronic Manufacturing (CEM)
  • Applications

    Applications


    Pump Controllers and DrivesHigh Speed / High Frequency Inverters Integrated Motor Controllers Motor Controllers for Low Inductance Motors Case Studies
  • Knowledge

    Knowledge


    Technical Articles What is a motor controller? Frequently Asked Questions (FAQs) Case Studies
  • About

    About Us


    Company History Our Team Careers Latest News

    Capability


    Manufacturing Capability Technology Research and DevelopmentResearch and Development Collaboration

    Quality and Assurance


    Quality

    Contact Us


    Contact our Sales Team Distribution / Agent Enquiries
  • Support

    Support


    Downloads
    Follow us
  • Products
Zikodrive
  • 0
    • Services
    • Applications
    • Knowledge
    • About
    • Support
    • Products
  • +44 (0) 330 127 7928
  • Follow us
  • Sign in
  • Contact Us
  • All Blogs
  • Latest News
  • Design Expand Capabilities with New Facility
  • Design Expand Capabilities with New Facility

    22 January 2026 by
    Phil Bates

    The Design team at Zikodrive have recently moved into new premises, marking a new and exciting time of development for the department at the start of 2026!

    With the team growing, and more lab space needed for designing and testing as demand for custom motor controllers grows, it was time to find more space and better facilities to keep up with the demands of this area of the business. Working in partnership with our current Landlord on the Topland Country Business Park, we were able to source what we needed in close proximity to our other unit, bringing minimal disruption to our current projects. A big thank you to our dedicated staff who helped with the move and the setting up of equipment, which ensured a smooth transition ready for the start of 2026.

    Our new unit has given us the opportunity to create a larger, open-plan office space for design collaboration, alongside more separate offices and facilities for staff members. The additional footprint means significantly more space to increase our testing capability, with a dedicated test facility purpose-built to support the development and validation of our motor controllers as they move through design. We've also been able to set aside a dedicated meeting space, giving the team a proper environment for design reviews, project discussions, and customer meetings — away from the hustle and bustle of the lab and office floor.

    The new premises also include separate office space for both our management and engineering teams, giving each function room to focus while still keeping everyone close enough to collaborate easily when a project calls for it. It's a layout that reflects how the department actually works day to day — close-knit where it matters, but with the space to think and work properly when heads-down time is needed.

    A big thank you must also go to Thornber's on-site maintenance team for decorating and making the building feel brand new and ready to move into.


    in Latest News

    Read Next
    Zikodrive Celebrates Ten Years of Innovation
    The company marks its ten year milestone

    • Home
    • •
    • About us
    • •
    • Products
    • •
    • Terms of Services
    Copyright © Round Bank Engineering Ltd - all rights reserved 
    Terms and Conditions
    Privacy Policy
    Powered by Odoo - The #1 Open Source eCommerce

    We use cookies to provide you a better user experience on this website. Cookie Policy

    Only essentials I agree